Welcome to Aurora photo gallery.

Below you will find photos of the assembly of the Aurora-exhibitionhouse.
Images are in a chronological order showing also the constuctions used.
Unfortunately some older browsers do not support the gallery.

20.5. The assembly of the logs is just about to begin. The first logs are already in their places.

Corners are tightened with cellular rubber.

Between each layer of logs we use a strip of rubber.

Ecological stripe is used to seal spaces.

Tight structure is achieved by laminated logs with advanced profile.

The first layer of logs is ready.

Logs are clearly marked to make the construction easier and faster.

Tight timber work in the corners.

The second round is getting ready. Horizontal sawings in the places of the doors are done beforehand in the factory.

Bolt holes are kept open.

Five layers of log layers are installed. You can now clearly see the places for the doors.

It's handy to put your drawings in to somekind of back plane.

23.5. the log walls are ready...

And the roof trusses installed...

During the same day the painting work was started.

Rough match boarding is almost installed.

Now the boarding is ready.

During eigth day of the construction of the roofing felt is installed.

Floor joists and ecological cardboards are waiting for the insulation to be installed.

Floors are insulated with ecological insulation.

The same insulation is installed to the roof.

Before midsummer the house lacks only windows.

As you can see the flowers are hanging in their pots and we have moved into the house.

 